Magnetite Projects

Extension Hill:  Testwork and Definitive Feasibility Study for the 5 Mtpa Extension Hill magnetite project in the mid-western region of WA.  Scope included the processing and concentration of the magnetite ore, pipelining to Geraldton and filtering, storage and transhipment of the product to pelletising plants in China.  Alternates for pelletising at Geraldton were also examined. Refer project sheet.

Ferrexpo:  Testwork and Definitive Feasibility Study for new mine and concentrating plant plus expansion of the existing magnetite iron ore mining, concentrating and pelletising operation in the Ukraine. Refer project sheet.

Ferrum CrescentScoping study for a new mine, concentrator and 1 Mtpa ironmaking plant to be located in Limpopo Province of South Africa.

Grange Resources:  Testwork and Definitive Feasibility Study for new mine and concentrating plant plus 90 km pipeline to the port of Albany, Western Australia with pelletising occurring in Terengganu, Malaysia. Refer project sheet.

Karara Mining Services: Series of studies and testwork culminating in a Definitive Feasibility Study for a 8 Mtpa magnetite concentrator, pipeline and dewatering plant at Geraldton’s port.  This project is now in the detail engineering phase (completion in April 2009) and ProMet is responsible for Front End Engineering Design (FEED) engineering for the concentrator which includes the High Pressure Grinding Rolls (HPGR), ball mills and magnetic separation.  Ongoing project support will be undertaken by ProMet’s engineering team in Beijing and will be followed by support on site during construction and commissioning.  Refer project sheet.

Mineralogy Pty Ltd:  Testwork, preliminary engineering, capital cost estimation and project management services for a proposed new grass-roots 12 Mtpa magnetite mine, beneficiation plant and pelletising plant to be located at Cape Preston, Western Australia.

OneSteel:  From the initial testwork programs, through various levels of feasibility studies to completion of detail engineering, procurement, construction and start-up of the plant for Project Magnet’s 2.2 Mtpa magnetite concentrator and 80 km pipeline at Whyalla, South Australia. Refer project sheet.

Windimurra Vanadium:  Testwork and feasibility studies, FEED engineering and partial detail design of the magnetite concentrator portion of the Windimurra Vanadium Project in the mid-west region of Western Australia. Refer project sheet.

Due diligence studies for a number of iron ore development and pelletising projects in India.

ProMet Engineers Australia
Phone: +61 8 9476 5700
Email: info@promet.com.au

ProMet Engineers Africa
Phone: +27 21 556 9759
Email: info@promet.co.za

©2003-2011 ProMet Engineers All Rights Reserved
Privacy Policy/Terms & Conditions

Staff Login